From our inboxQuestions We Hear From Foodservice & Kitchen Consultants.
Most questions reach us right before a contract is signed or a policy is bound. They are usually about what a client's contract demands and what happens when a consultant makes a mistake.
Answers are general. Your policy and your contract always control.
Ask yours on a 15-minute call → My client sent insurance wording for the certificate. Is this normal?
Usually, yes. Additional insured, waiver of subrogation, primary and non-contributory and 30-day notice show up in most owner and builder contracts. Many business policies include blanket wording that applies when a written contract requires it. We check the contract against your actual endorsements before the certificate goes out.
Am I covered if a claim comes from a consultant I hired?
Your consultants need their own professional liability. If you get pulled into a claim because of their work, your policy may respond to defend you. It depends on the policy and the facts, so it is decided claim by claim. Collecting their certificates up front helps.
What retro date will I get if I switch carriers?
Keeping your existing retro date is the goal when you move. It depends on the carrier and your history. Some carriers start a new firm at inception and extend prior acts after a year. We confirm it in writing before you bind.
Does a limitation of liability clause lower my premium?
With some carriers, yes, when you use it consistently. The credit usually applies from the point you start using it, not to past projects.
Do kitchen design consultants need professional liability insurance?
Many owner and architect contracts require it, commonly $1M per claim and $2M aggregate. Claims tend to involve rework and lost revenue from a late opening, which general liability does not respond to.
What if I also sell the equipment?
Reselling equipment brings product and contracting exposure that a professional liability policy may not cover. Carriers want to know about it up front, and you may need general and product liability written for that work.
Can I be blamed for a delayed restaurant opening?
A claim can be made if a design error caused the delay. Whether it succeeds depends on your scope, the contract and what others did. A waiver of consequential damages can limit lost revenue claims. This is general information, not legal advice.
Who is responsible for the hood suppression system?
It depends on the contract. Usually the suppression contractor designs the system, the mechanical engineer designs the exhaust, and the consultant lays out the cooking line. Your scope should say which pieces you provide and which you only coordinate.